240-key Hotel Fit-out — Riyadh
Cut, edged, and delivered FR-grade MDF, walnut-veneered panels, and 240 pre-hung doors for a 240-key hotel fit-out on the Diplomatic Quarter ring road.
Client
Confidential · international 5-star operator
Location
Riyadh, Saudi Arabia
Duration
8 weeks
Scope of work
What we supplied.
- 2,400 sheets of 18mm FR-grade MDF for headboards and feature wall panels
- 320 sheets of walnut-veneered MDF for lobby wall cladding
- 240 solid-core interior doors hung in factory-set framesets
- Numbered-pallet delivery matched to floor-by-floor installation schedule
- On-site QC visit at week 4 to confirm alignment with mill certificates
By the numbers
8 weeks.
2,400 sheets
FR MDF
240
Doors hung
8 weeks
Duration
84
Pallets
“Same yard, same trucks, same phone number — for any project size.”